Skip to main content

Campground - Meter Readings

Learn how to add meter readings in bulk using Sharper's Meter Read Batch feature.

Meter readings track electricity consumption at each hookup site. Use the Meter Read Batch to record readings for all sites at once and generate invoices automatically.


Adding Meter Readings

  1. From the left navigation pane, click Campground.

  2. Click Meter Readings on the top ribbon.

  3. Click Meter Read Batch in the top right corner.

The Meter Read Batch screen will open with the following options:

Field

Function

Space Group

Groups the batch by Space Group, letting you work through one section of the campground at a time.

Reading Date and Reading Time

The date and time the physical reading was taken.

Invoice Date

The date that will appear on invoices generated from this batch.

Service Charge

Optional flat charge applied for the act of reading meters, if your campground uses one.

Invoice Now

When enabled, invoices are generated automatically when you save the batch.

Auto Pay

Does not immediately run autopay. Marks the generated invoices as eligible for autopay when the CRM autopay batch is later processed.

Payment Term

Invoice payment term. Leave blank to use the system default.

Previous Reading

The last recorded meter reading. Filled automatically after the first batch.

Current Reading

The reading taken today. The system calculates the charge based on the difference.

  1. Set the Reading Date and Reading Time to when the physical reading was taken.

  2. Enter the Invoice Date.

  3. Optional — Enable Invoice Now to generate invoices automatically on save.

  4. Enable Auto Pay if you want the generated invoices to be eligible for CRM autopay processing.

  5. Leave Payment Terms blank to use the system default, or select a specific term if needed.

  6. Going down the list, enter the Current Reading for each meter.

  7. When finished with the current Space Group, click Save in the top right.

  8. Confirm the Save button turns green, then use the Space Group selector to switch to the next group.

  9. Repeat Steps 6–8 for each Space Group until all readings are recorded.

First-Time Setup: On your first batch, enter both the Previous Reading and the Current Reading for each meter. For all subsequent batches, only the Current Reading is needed — the previous reading is carried forward automatically.

You cannot save a batch if any Current Reading equals the Previous Reading. If a meter has not changed, leave that meter's Current Reading field empty.


Filtering Meter Readings

The meter readings list can be filtered to narrow results before creating a batch or reviewing entries.

Filter

Use

Space Group

Narrow the list to a specific section or group. Useful when processing meter readings for one area of the campground at a time.

Power Meter Type

Filter by meter type (e.g., 30A, 50A) to review or process readings for a specific service level only.

Status

Filter to show only invoiced or non-invoiced readings to confirm what has been billed versus what is still pending.

Did this answer your question?